Window frames and concrete floor

The Asian Library on the roof of the University Library is taking shape. The window frames have been img_2416placed and the concrete floor was put into place. In the coming weeks the windows will be placed to make the building water- and windproof.

img_2259

Tagged with:

Leave a Reply

Your email address will not be published. Required fields are marked *